October 15, 2024

San Antonio River Mission Reach to extend to The Greenline at Brooks

Great news for those who want to walk, jog or bike the 15-mile trail from Brackenridge Park to The Greenline at Brooks will be able to soon do so. Construction has begun to build the pathway that connects the San Antonio Mission Reach all the way to the Southside at Brooks.

San Antonio River Authority General Manager Suzanne B. Scott, Jim Campbell the Brooks Board of Directors Chair and Leo Gomez, the CEO of Brooks made the connection possible.